Start at the bottom of the roof and place the first piece of rigid foam insulation against the metal flashing starting at the center line.
Rigid foam above the roof sheathing.
Use rigid foam insulation to cover wider spans of roof sheathing between joists.
Here is the controversy.
We live in zone 5 suburb of chicago and are hopefully about to put rigid foam above the roof sheathing on just the northeast roof portion of our roof.
Cut each sheet to the desired size using a utility knife then fasten it in place using staples or adhesive.
With three layers of 11 2 in.
The nailbase panels are installed with long screws that have flat heads.
Then a second layer of plywood sheathing and asphalt shingles following the steps explained in this article.
Nail it around the edges with roofing nails.
Polyisocyanurate insulation above the sheathing and approximately 91 4 in.
To save a step i would recommend using a nailbase panel foam preadhered to osb or sometimes plywood on one side only see photo facing page.
3 benefits of rigid foam sheathing.
Rigid foam may shrink so some builders are wary of depending on the rigid foam to be your air barrier.
More effective insulation with r values ranging from 3 6 to 8 0 rigid foam sheathing has much better insulation per inch than other materials i e.
Apply a continuous air control membrane to existing roof sheathing or tape all joints between roof sheathing panels with an acrylic or butyl adhesive.
However for the best performance and for when space comes at a premium it s tough to beat rigid foam insulation.
4 of polyiso under 4 of eps all above the original roof sheathing.
Of cellulose insulation in the rafter cavities the roof shown here has an r value of approximately 63.
In any case the foam needs to be thick enough to keep the interior of the foam above the dew point in your climate and the seams need to be carefully taped with a high quality compatible tape.
Deck for a thick roof rigid foam insulation installed above the roof assembly can create an energy smart roof.
The main issue people encounter with insulation above sheathing is when it expands.
How to retrofit a roof to a high performance roof with insulating sheathing above the roof deck plus cavity insulation in roof framing remove existing roofing and non adhered roof underlayment.
Box beam gable framing new gable overhang is framed in the form of a box beam hanging off of a new layer of roof plywood roof sheathing cantilevered over the top of the 3 layers of rigid insulation.
Over the foam you will need something to nail the roofing to usually a solid sheet of plywood or osb.
Avoids nails or screws which could penetrate the metal roof and cause leaks.