Essentially the spine of a conventional stick framed roof the ridge board is sandwiched between the meeting ends of the roof rafters.
Repair where two roofs meet.
To locate a leak your roofer will get on the.
Then reshingle sliding metal step flashing behind the fascia board the trim behind the gutter.
The ridge is the peak where two sloped roof sections meet.
At the low end of the valley the subfascias of the two roofs are mitered with a block filling in the roof framing.
If leaks continue to occur from ice dams consider installing roof edge heating cables.
How to repair valleys on a roof.
Place the 2 by 4 inch piece of lumber along the center of the flashing.
This should cover the most leak prone areas.
Roof valleys are troughs that discard runoff water where two sections of sloped roof meet.
Position the flashing between the two roof pitches.
Slide the right edge of the flashing under the highest roof pitch.
If leaks continue to occur from ice dams consider installing roof edge heating cables.
Sheathing blocking is added along the valley and the sheathing pieced in for both roof planes.
I tried tarring the roof where the pitch change occurs but the leaks came back.
The valleys on many older houses comprise layers of roofing paper which.
Part of a roof s frame a ridge board runs horizontally along the peak of a sloped roof.
The old roof was 6 12 pitch and it goes into a 2 12 pitch.
So now i need to do something more drastic.
Remember to caulk the underside of the flashing with a sealant.
To transition the eaves the horizontal fascia extends to the last rafter tail and a vertical return finishes the transition.
Then it will run down a rafter a ways before dripping down.
The valley flashing laid over the joint where the two roofs meet should overlap the step flashing at least 2 in.
Install valley battens on both ends of the roof valley then attach first flashing 3 4 inches over the roof flange and another 3 4 inches over the fascia if any is present.
I assume that is where the water gets in.
How to repair a leaking roof.
The valley flashing laid over the joint where the two roofs meet should overlap the step flashing at least 2 in.
Then reshingle sliding metal step flashing behind the fascia board the trim behind the gutter.
The roof is literally at the top of any homeowner s maintenance list and they re subject to lots of wear and tear.
Fortunately you can mend minor issues without the help of a professional.
This should cover the most leak prone areas.